Factor of reliability of cost information and practical limitation .
- Main sources of cost data are obtain from the contractor price which is subject to consideration variables
* From contractor to contractor
* Project to project
* District to district
* Over a period of time
* Lack of concidence between the unit production cost and unit design cost account
* Difficult of predicting operational times , regional different and etc .
* Additional cost due to specific design , abnormal requirement are forecasting stage .
* Factor of consideration
-Type of contract
-Project location
-Size of project
- Availability of labour
-Stability of material prices
-Whether fixed price tender
- Method of pricing
- Special requirement as to speed
* Must interpret the cost appropriate before use .
* Cost information used by QS obtained from price BQ and is advisable to use average price rather than lowest .
* Prices different in billes rate are not necessary due to mistakes in estimating .
* * Unit cost is made up of standard of within determinable parameter