Factor of reliability of cost implication and practical limitation
- Main source cost data are obtain from contractor prices which is subject to consideration variable
* from contractor to contractor
* Project to project
* district to district
* Over a period of time
* Lack of concidence between the unit of productioc cost and unit of design cost account .
* Skilled judgement is neccessary when extracting the cost data from price BQ
* Cost information used by the QS is advisable to use average price rather than the lowest
* Additional cost due to specific design and abnormal requirement are in forecasting stage
* Difficult of predicting operatinal cost , and regional different ,etc
* Unit cost is made up of standard cost within determinable parameter .
* Factor of consideration :
- Type of project
- Size of project
- Location of project
- Stability of material
- Availability of labour
- Fixed price tender
- Method of pricing preliminaries
- Climate of the industry
* Necessary to know the condition of the prices
- Price different in billes rate are not neccessary due to mistake