Road and Pavements
Excavating oversite , commencing from reduce levels including earthwork support , levelling , grading and compacting bottom , trimming sides of excavation , formation of slope .
Maximum depth not exceeding 1.00m depth .
Excavate depth
sand 50
c run 300
binder 50
wearing 50
450
Remove surplus excavated material from site .
Take qty
Keeping the surface of the site and the whole of the excavation free from all surface water by pumping or otherwise .
Keeping the whole of the excavation free from all ground subterranean water by pumping or otherwise .
Item
Sand , well consolidated in layers , each layers not exceeding 150mm thick .
.
Sub-base , 50mm thick
Road at blk A
Crusher run , well consolidate in layer , each layers not exceedding 150mm thick , average 300mm thick
Base course , exceeding 250mm thick .
Prepare and apply bituminous tack coat at a rate of 330ml / m2 to finishes surfaces of premix macadam binder course to receive premix macadam wearing course ( both measure separetely ) .
On surfaces of roads , levels including laids to falls , falls and cross falss and to slpe not exceeding 15 degree from horizontal .
m2
Prepare and apply bituminous prime coat at a rate of 440 ml/m2 to finishes surfaces of crusher run . base course to receive premise macadam binder courser ( both measure separetely )
On surfaces of roads ; ;leve; including laids to falls , falls cross falls and to slopes not exceeding 15 degree from horizontal .
Layer of premix macadam bindeer course , laid on crusher base course ( measure separately ) ; well consolidated
50mm thick ; level including laid to falls , falls and cross falls and to slope not exceeding 15 degree from horizontal .
layer of premix macadam wearing course , laid on premix macadam binder course ( measure separetely ) ; well consolidated in layers .
50 mm thick , level including laids to falls , falls and cross falls ,and to slope not exceeding 15 degree from horizontal .
Plain in-situ concrete ,Grade 20 to B.S. 5328 , kerb ( Type 1 ) , cast - in -situ in continuous length with chamfered / sprayed and twice rounded top edges , setting on and including plain - i-situ concrete . Grade 20 400mm x 100mm thick beds ; mitred , stoolings , returned ends , formwork , all moulds , finishing fair on exposed surfaces extra excavations , earthwork support , levelling , grading and compacting bottom , trimming sides of excavations , formation of slopes ; backfillings and disposing of surplus excavated materials from site .
550mm x 175mm high .
Plain in-situ concrete , Grade 20 to B.S. 5328 , kerb ab,d,
550mm x 175mm high , curved to 7600mm radius .
Forming opening through in-situ concrete kers including hacking , cutting , formwork , concrete and reinformcenet with 2 nos . 12mm x 820mm long and 7 nos . 6mm x 100mm long mild steel bar reinformatioment .
Hinged mild steel grating overall size 350mm x 150mm constructed of 50mm x 12mm , thick flats as framing stiffness , 50mm x 6mm thick as infills , including 6mm thick mild steel '2' angle guide frame ; all necessary welding ; approximately - kg .
Scupper drain outlet
scupper drain outlet .
Prepare and apply one coat of metal prime and two finishings coats of bituminous paint on general surfaces of metalwork to gully put gratings ( measured flat overall on boths sides ) . Not exceeding 0.50m2 externally .
Scupper drain outlet .
Excavate trenches for 225mm diameter drainages pipes next to roadway ; commencing from reduce levels including earthwork support , levelling , grading and compacting bottom , trimming sides of excavations , formation of slope ; backfilling . and disposing of surplus excavated materials from site ; not exceeding 2.00m deepth , average 0.50m deep .
ditto ( curved kerbs )
225mm diameter salt glazed earth ware scupper pipes , inclduign all ends , angles , junctions , bedded , laid and jointed in cement and sand ( 1:3 ) in trench
scupper drain at block A
Allow for connection of drainage pipes to existing work ; including extra excavations , extra cutting of premix road surfaces ( if any ) , earthwork of slopes ; backfillings and disposal of surplus excavated materials from site : accessories , making good any defects any leave everthing in perfect working order , all in accordance with the specification the entire satisfaction and approval of the S.) and Local Authroities . Connecting end of 225mm diameter drainage to existing surface water drain .
( straight kerb )
( Curved kerb )
Prepare and apply two coat of approved reflective thermoplastic road markings paint on general surfaces of roads premix .
Borken line as centre lines , 1000mm long at 2700mm centres ( measure across brtoken lione ) , not exceeding 150mm girth .
Prepare and apply two coat of approved reflective thermoplastic road marking paint a.b.d.
Lines , 150mm - 300mm girth .
Tranverse stop line at Block A .
Prepare and apply two coat of approved reflective thermoplastic road marking paint a.b.d.
Humps , over 300mm girth .
Straight ahead direction arrows , 2125mm x 825mm Bloack A
Turn left and right direction arrows , 3280mm x 1815mm
Supply and install Standard traffic road sign with and including reflectrosied symbols , numbericals , letter , sign , and plates mounted on galvanised steel post , cast into and inclduign 300mm x 300mm x 600mm deep plain in-situ concrete Grade 20 footings , all necessary exvavations , earthwork support , levelling , grading and compacting bottom , formation of slope , backfilling and disposing of surplus excavated materials from site ; formwork , fixing , bracket , welding and paiting to the entire fsatisfaction and approval of the S.O and the local authroities
Reinforced precast concrete , Grade 20 to B.S. 5328 , kerbs cast in 600mm lenbgths with chamfered / sprayed and twice rounded top edges , setting on and including plain in-situ concrete Grade 20 400mm x 100mm thick beds and 150mm x 75mm precast concrete channel slabs ( mesure sepaately ) on other side , reinforcement , mitred , stoolings , returned ends , formwork , all moulds , finishing fair on exposed surfaces , levelling , grading and compacting bottom , trimming sides of excavations formation of slope ; backfilling and siposing of surplus excavated materials from site ; placcing in position , bedded and jointed in cement and sand ( 1: 3 ) mortar .
Reinforced precast concrete , Grade 20 to B.S. 5328 , channels slabs , cast in 600mm lenbgths , icnlduign reinforcement mitred , stoolings , returned ends , formwork , all moulds , finishing fair on exposed surfaces , extra exvavations ,earthwork support .
125mm x 75mm thick
125mm x 75mm thick , curved to 7600mm radius
Premix macadam humps
Ellipse shape humps , overall size 66000mm x 2500mm wide , 100mm high , as per drawing No . _
Alloq for joiting premix macadam roads to existing premix macadam road , including all necessary breaking up of exisitng kerbs , channel slabs , outlet pipes , etc , and making good surfaces of roads at joints , and intersections , all to the entiure satisfaction and approval of the S.O and Local Autorities .
Joiting to esiting road .
As-built plans
Allow for provision of as built plan of the Road and Pavements; all in accordance with the specification and to the entire satisfaction of the S.O and Local Authorities .
The whole road and pavements .
2012年12月29日星期六
Elemental Cost analysis
- Used for similar previous project as basic for estimated
- The cost is completed on a superficial or floor area basis but the overall superficial unit costs is broken down into elements and sub-elements
- It is possible to make cost adjustment for variations in design in new projects as compare with previous scheme .
- Necessary to updatae the cost to take into account of increased cost which occurred sinder tender date for the cost analysis is available .
S. H
*Storey height of the building are determined by the client requirement
* The construction items that may influence by the variantion in storey height will be :
- Longer waste pipe and cables
- Higher construction cost for wall paritions
- Longer waste pipes for sanitary appliances
- More costly foundation to support the increased load .
- More cost to construct the staircase and lift
- Larger volume for the air-conditioning services
-Higher cost for construction of roof due to hoisting
Storey Height
- Storey height of the building are determied by the client requirement
- The construction items that will affected by the variation in storey height would be :
* Walls , partitions , and associated finishing work
* Longer waste of pipes for sanitary appliances
* Higher construction cost of roof due to hoisting
* Longer waste for pipes and cables
* Increase volume for air-conditioning
* More costly foundation to support the increased load .
* Increase cost for construction for staircase and lift
Storey height
- The storey height of building are determined by the clients requirements
- The construction items that are affected by the variations in storey height would be :
*Longer length for pipes or cables
* Higher construction cost for roof due to hoisting
* Increase cost of constructing staircase and lift
* More costly foundation due to increased load
* Wall , partitions and their associated finishing work
* Increase volume to be air - conditioning
* longer waste pipes to sanitary appliances
C. S
- An economical layout will have a main aims to reduce in circulation space because :
* Circulation area such as entrance , lift lobby , staircase and corridor etc cannot use for profitable purpose .
- The percentage allocated of circulation space vary in type of building :
* office 23 %
Circulation space
-An economical layout will have one of its main aim to reduce the circulation space because :
* circulation space such as corridor , lift lobby , entrance and staircase etc cannot use as profitable purpose .
* The proportion of floor space allocated to circulation space vary between the types of building .
* office 23 %